image
Casale Moferrato (AL) | Piedmont, Italy

Hydroelectric Power Plant

New Hydroelectric Power Plant on the Po River

Cliente: Idro Baveno s.r.l.

Budget: € 19.617.274,47

Partner: –

Design and construction of a new hydroelectric power plant on the Po River, equipped with an inflatable tubular mobile weir.

The structure raises the river level to allow water diversion toward the power plant, located on the left bank and underground beneath the floodplain level. The project includes an in-river barrier weir, an upstream intake structure, a diversion canal, a powerhouse housing the generating units, a tailrace channel, and riverbank reconnection works.

The scheme also предусматри a fish ladder to ensure ichthyofauna migration, a canoe ramp, and an electrical delivery substation with dedicated technical rooms.