image
SETTIMO TORINESE, TORINO

REQUALIFICATION OF THE GYM OF THE VIII MARCH INSTITUTE

REQUALIFICATION OF THE GYM OF THE VIII MARCH INSTITUTE

Client: Comune di Settimo Torinese

Budget: € 1 277 042,79

Partner: Studio tecnico Arnodo 

Architectural Design: Sertec srl

Electrical Design: Sertec srl

Hydraulic Design: Sertec srl

The Municipal Administration of Settimo Torinese has entrusted Sertec Engineering Consulting and the Armodo studio with the project for the redevelopment of the gym of the VIII Marzo Institute in Settimo Torinese, financed with the PNRR, in order to obtain seismic and fire safety measures for be able to approve (CONI) the gym for volleyball.

The following will have top priority: Structural safety, CONI approval, fire prevention adaptation and the removal of architectural barriers.

The project includes:

♦ Adaptation of the existing electrical system 

♦ Creation of new lines for additional services such as changing rooms and heating

♦ Mechanical interventions such as the demolition and reconstruction of toilets and the installation of a new heating system

♦ Interventions on the water-sanitary system and controlled mechanical extraction