image
Collegno, Piemonte

NEW PRIMA INDUSTRIE PLANT

Prima Industrie requests the construction project of several buildings

Client: Prima Industrie S.p.a.

Budget: € 7.261.492,38

Architectural Design: Sertec srl

Structural Design: Sertec srl

Electrical Design: Sertec srl

MEP design: Sertec srl

Fire protection design: Sertec srl

Geotechnical design: Sertec srl

Hydraulic Design: Sertec srl

Landscape Design: Sertec srl

Construction supervision: Sertec srl 

Safety coordination: Sertec srl 

Prima Industrie S.p.a. has entrusted Sertec Engineering Consulting with the project for the construction of various buildings dedicated to the production, research and development of the company. 

Since this is a rather complex intervention, it was decided to divide the project into 3 successive phases, taking into account building with criteria of modularity and future expandability. 

The main interventions are the following: 

♦ new construction of building B1 intended for offices complete with related services, archive in the basement and a floor intended for the “Research and Development” function, connected to the new warehouse with laboratory function 

♦ new B2 and B3 buildings intended for production and offices with large technical spaces and warehouses

♦ Urbanization works and external arrangements.

The project also pursued the principles of environmental sustainability in both the design and construction phases. In fact, buildings have been designed that have a lower impact on the surrounding environment both in terms of building components, innovative technologies and energy saving. 

Prima Industrie is a 100% “carbon-free” production plant as it uses only renewable energy sources for the site’s entire energy needs. This important result was possible thanks to the presence of an open-cycle vertical geothermal system and a photovoltaic system.